TRC
Full Depth  Edited Scaled

Timothy Rose Contracting

Full Depth Reclamation

Full Depth Reclamation

Full Depth Reclamation (FDR) is a process in which the existing worn-out pavement is excavated and recycled to reconstruct the new pavement structure. It is used when pavements are severely distressed and need to be removed and replaced. The deteriorated asphalt is pulverized, mixed with cement and water, and then compacted to form a stronger road base. The new road base is then overlaid with a new layer of asphalt concrete, completing the reconstruction of the road. FDR has cost savings of 30-40% and a lower construction time in comparison to traditional methods.

Full Depth  Edited Scaled
Get a free quote in 30 minutes?

Get a free quote in 30 minutes?

We offer ready-mix concrete that is ideal to take on projects such as foundations, repair and restoration of existing concrete surfaces, slab on grande for floors or parking lots and paving.

OUR SERVICES

Contact us

Don’t hesitate to reach out, we would love to talk to you.

OUR OFFICE

825 8th St
Vero Beach, FL 32962

Monday - Friday: 9AM - 5PM
Closed on weekend