Added turn lanes and widened a major intersection in Indian River County, FL. Work included new drainage, water main and force main pipe, curbs, sidewalks, roadway, traffic signals, lighting, and a bridge.
Widening 2-mile portion of 58th Ave. Increased travel lanes from two to four. Work included new drainage, water main, curbs, sidewalks, roadway, traffic separators, traffic signals and a bridge.
30 miles of new roadway for city of Palm Bay. Work included soil cement, full depth reclamation, and pavement.
7.2 miles of full depth reclamation. Work included full depth reclamation, drainage, water main, pavement and traffic signals.
10,000 LF of gravity sewer 6-26’ deep.
Two lift stations - 32’ deep
Water and force main.